How residents fought for – and won – a slower Franklin Boulevard

After years of advocacy, study, and collaboration, the first phase of traffic calming infrastructure has been completed on Franklin Boulevard in Cleveland, with the second phase expected to conclude in 2023. Seven new traffic circles are part of the redesign.